Listed Read from published pages. Not yet checked by hand. Read . What this means · Sources
Add to my planIn your plan
Profile summary
4 facts, each with its source
In the firm's words
- Lists structural, architectural, MEP, interior and landscape design, construction, maintenance, MEP installation and construction consulting for homes, villas and hotels 1
- Says it handles PBG and SLF permit applications on request 2
- Says it works in Bali, Lombok, Flores and other eastern Indonesian regions 1
- Charges for initial meetings (transport, meals and one day's work for two people), refunded or deducted from the construction fee 2
What the firm says about itself, from its own pages; we have not confirmed it independently. The number after each fact links its source.
Business details
- Website
- balibuild.com
- Phone
- +62 819 9930 6040
- Address
- Jl. Mudutaki No.86, Banjar Tegal Jaya, Dalung, Bali
Fees, as published by the firm
The firm's own published wording and figures; they are not quotes and may have changed.
-
Construction packages
Three packages published: Standard Rp 8,5 JT, Pro Rp 9,5 JT, Premium Rp 12,5 JT. The page does not state the unit. The packages differ in whether topography and soil test, architectural design, building permit, interior and furniture, and landscaping are included
- Standard: Rp 8,5 JT (unit not stated)
- Pro: Rp 9,5 JT (unit not stated)
- Premium: Rp 12,5 JT (unit not stated)
Source 3
The firm's answers
3 of our standard questions
The same questions are put to every firm so answers can be compared; each answer is the firm's own, taken from what it publishes, not our assessment.
-
How are quotes calculated?
Says design and consultation are free for almost all construction it takes on. Without a design it drafts an initial concept, then a detailed design and contract; with an existing design it prices the work and quotes. Bids are valid for one month because material prices change 2
-
How long does a typical job take?
Depends on building size; set in the contract 2
-
What is the payment schedule?
30-40% deposit of the contract value, then payments by milestone or percentage of completion, as set in the contract 2
Other contractors and builders in Bali
Sources
3 pages
Every fact above comes from a published page, read on the date shown.
- 1
- 2
- 3
- First listed
- Sources last read
- Not yet recorded: Since, Team size, Areas (stated only in a fact), Languages (stated only in a fact), Licences, Projects. How we fill a profile