What does it cost to build in Bali?

Firms listed here publish building rates of IDR 4,500,000 to 20,000,000+ per m² of floor area. Firms that price in USD publish USD 600 to 2,500+ per m² of floor area. These are the firms' own figures, not quotes, and what each rate includes differs from firm to firm.

Published building rates in Bali

  • IDR 4,500,000 to 20,000,000+ per m²

    10 rates from 4 firms

  • USD 600 to 2,500+ per m²

    7 rates from 4 firms

Last read 10 sources on 9 sites

Estimate a budget from your floor area

This multiplies your floor area by the building rates that firms publish on their own websites. It is not a quote and not an estimate of any one project. What a rate includes differs from firm to firm, so read the note under each one. Information, not financial advice.

At IDR 4,500,000 and IDR 20,000,000+ per m²
Floor areaAt the lowest rateAt the highest rate
100 m²IDR 450,000,000IDR 2,000,000,000+
200 m²IDR 900,000,000IDR 4,000,000,000+
300 m²IDR 1,350,000,000IDR 6,000,000,000+
400 m²IDR 1,800,000,000IDR 8,000,000,000+
At USD 600 and USD 2,500+ per m²
Floor areaAt the lowest rateAt the highest rate
100 m²USD 60,000USD 250,000+
200 m²USD 120,000USD 500,000+
300 m²USD 180,000USD 750,000+
400 m²USD 240,000USD 1,000,000+

Published rates per m²

Each firm's own rate per m² of floor area, as published on its website. Figures are not converted between currencies.

In IDR: 10 rates from 4 firms
  • Beeru.living · Construction

    from IDR 15,000,000/m²

  • Bloka Build · Starter

    IDR 4,500,000 to 5,500,000/m²

    Structure to interior paint; design, PBG, AC, built-in furniture and landscaping not included

  • Bloka Build · Standard

    IDR 5,500,000 to 7,000,000/m²

    Structure to interior paint; design, PBG, AC, built-in furniture and landscaping not included

  • Bloka Build · Premium

    from IDR 7,000,000/m²

    Structure to interior paint; design, PBG, AC, built-in furniture and landscaping not included

  • CV Ainur Balindo Jaya · Mid-range (Kelas Menengah)

    IDR 4,500,000/m²

    Estimate

  • CV Ainur Balindo Jaya · Deluxe (Kelas Deluxe / Atas)

    IDR 5,400,000/m²

    Estimate

  • CV Ainur Balindo Jaya · Villa (Kelas Villa)

    IDR 7,000,000/m²

    Estimate

  • Kingswood Bali · Standard

    from IDR 9,000,000/m²

  • Kingswood Bali · Mid-range

    IDR 10,000,000 to 14,000,000/m²

  • Kingswood Bali · Premium

    IDR 15,000,000 to 20,000,000+/m²

IDR per m². A bar is a published range, a dot a single figure, and a fade a "from" or "+" figure with no published top.

In USD: 7 rates from 4 firms
  • ASA Group Indonesia · Standard/Boutique

    USD 850 to 1,100/m²

    Structure, basic MEP and standard finishing; estimate

  • ASA Group Indonesia · Mid-Range Luxury

    USD 1,200 to 1,600/m²

    Structure, basic MEP and standard finishing; estimate

  • ASA Group Indonesia · Ultra-High-End

    USD 1,800 to 2,500+/m²

    Structure, basic MEP and standard finishing; estimate

  • Balitecture · Construction

    from USD 1,000/m²

  • Exuberance Studio · Prefab, naked build

    about USD 1,000/m²

    Ex-factory; shipping and foundation design not included; 2024 prices

  • Exuberance Studio · Prefab, full build

    about USD 1,500/m²

    Ex-factory; shipping and foundation design not included; 2024 prices

  • Teville · Construction

    USD 600 to 2,000/m²

    Structure, basic MEP and standard finishes

USD per m². A bar is a published range, a dot a single figure, and a fade a "from" or "+" figure with no published top.

Materials and labour

A fixed list of 27 items. A market price is shown once at least 2 independent sources have given a price within 90 days; so far 0 items have one. Official ceilings, the most a city may budget for an item, are shown on their own for 23 items. The list may still change before the first full round of prices.

ItemMarket priceOfficial ceilingReadings
Structure
Cement, 40 kg sackPortland Composite Cement (PCC) or Portland cement type I, 40 kg sack, SNI marked Not enough readings yet

IDR 51,000 to 96,000 per sack11 lines

11
Cement, 50 kg sackAs above, 50 kg sack Not enough readings yet

IDR 67,000 to 85,000 per sack5 lines

5
Rebar 10 mm, 12 mDeformed or plain reinforcing bar, 10 mm nominal, 12 m length, full SNI weight (not undersized 'banci') Not enough readings yet

IDR 104,000 per bar2 lines

2
Rebar 13 mm, 12 mDeformed reinforcing bar, 13 mm nominal, 12 m length, full SNI weight Not enough readings yet

IDR 181,000 per bar1 line

IDR 14,000 per kg1 line

2
Building sandSand for masonry or concrete (pasir pasang or pasir beton), delivered or at yard as stated Not enough readings yet

IDR 191,000 to 364,000 per m³3 lines

3
Crushed stoneCrushed stone 1 to 2 cm for concrete (batu split 1/2) Not enough readings yet

IDR 427,000 to 1,072,000 per m³4 lines

4
Ready-mix concrete K-300Ready-mixed concrete grade K-300 (about fc' 25 MPa), delivered Not enough readings yet

IDR 1,784,000 per m³1 line

1
Timber, merantiMeranti sawn timber, any section, priced per m3 Not enough readings yet

IDR 3,665,000 to 11,254,000 per m³4 lines

4
Light steel C75, 6 mCold-formed light steel truss channel C75, 0.75 mm, 6 m Not enough readings yet

IDR 160,000 per bar1 line

1
Walls
AAC blockAutoclaved aerated concrete block (bata ringan), 600 x 200 x 75 or 100 mm Not enough readings yet None found 0
Red brickFired clay brick (bata merah), standard size, per piece Not enough readings yet

IDR 1,000 to 3,000 per piece4 lines

4
Concrete blockConcrete block (batako), standard size, per piece Not enough readings yet

IDR 3,000 to 3,600 per piece4 lines

IDR 4,000 per m³1 line

5
AAC thin-bed mortar, 40 kgReady-mixed thin-bed mortar for AAC block, 40 kg sack Not enough readings yet None found 0
Paras stoneParas (Balinese sandstone) block or cladding piece; size recorded in as_listed Not enough readings yet

IDR 19,000 to 435,000 per piece7 lines

IDR 9,000 to 439,000 per m²3 lines

10
Envelope and finishes
Galvalume roofing sheetGalvalume corrugated or trapezoidal roofing sheet (spandek), 0.30 to 0.35 mm, per metre length Not enough readings yet

IDR 77,000 to 129,000 per m²2 lines

2
Granite tile 60 x 60Porcelain or homogeneous granite tile 600 x 600 mm, standard grade Not enough readings yet

IDR 251,000 to 599,000 per m²13 lines

13
Wall paint, 20 LInterior or exterior acrylic wall paint, 20 L pail (or 25 kg where sold by weight) Not enough readings yet None found 0
Gypsum board 9 mmGypsum plasterboard 9 mm, 1200 x 2400 mm Not enough readings yet

IDR 88,000 per sheet1 line

1
Cementitious waterproofingCement-based waterproofing coating, 20 kg Not enough readings yet None found 0
Clear glass 5 mmClear float glass 5 mm, cut, per m2 Not enough readings yet

IDR 163,000 to 209,000 per m²3 lines

3
Services
PVC pipe 4 inch, 4 mPVC pipe 4 inch (about 110 mm), class AW, 4 m length Not enough readings yet

IDR 122,000 to 172,000 per metre2 lines

2
Cable NYM 3 x 2.5 mm²NYM cable 3 x 2.5 mm2, SNI; roll length recorded in pack Not enough readings yet

IDR 28,000 to 37,000 per metre2 lines

2
Labour, per person per day
LabourerUnskilled construction labourer (pekerja), one day Not enough readings yet

IDR 139,000 per day1 line

1
MasonMason (tukang batu), one day Not enough readings yet

IDR 152,000 per day1 line

1
CarpenterCarpenter (tukang kayu), one day Not enough readings yet

IDR 152,000 per day1 line

1
Steel fixerReinforcement steel fixer (tukang besi), one day Not enough readings yet

IDR 152,000 per day1 line

1
ForemanSite foreman (mandor), one day Not enough readings yet

IDR 221,000 to 268,000 per day2 lines

2

Read 2 pages on jdih.denpasarkota.go.id

Prices are compared only within the same unit, as each source states it. Where a source lists one item several times (by brand or grade), every line counts and the range spans them.

How to read these figures

  • Rates per m² are each firm's own "from" figure or range, read from its website on the date in the sources. They are not quotes, and we have not confirmed them with the firms.
  • A rate can mean different things: a construction-only price, a design-and-build package, an online estimate, or a prefab price at the factory gate. The note under a rate gives what the firm says it covers.
  • Official ceilings come from the price standards a city sets for its own budget. They are the most it may pay, not shop prices, and they are often rounded.
  • Before you sign, ask for a priced bill of quantities (RAB) and compare it line by line. See how to hire a builder in Bali and what a quantity surveyor does.

Sources

  1. Beeru.living: published rates Read · beeru.living
  2. Bloka Build: published rates Read · blokabuild.com
  3. CV Ainur Balindo Jaya: published rates Read · abjbali.com
  4. Kingswood Bali: published rates Read · kingswoodbalivillas.com
  5. ASA Group Indonesia: published rates Read · withasa.com
  6. Balitecture: published rates Read · balitecture.com
  7. Exuberance Studio: published rates Read · exuberance.studio
  8. Teville: published rates Read · teville.com
  9. Peraturan Walikota Denpasar 17/2026, Standar Harga Barang, budget year 2027 Read · jdih.denpasarkota.go.id
  10. Peraturan Walikota Denpasar 18/2026, Standar Harga Jasa, budget year 2027 Read · jdih.denpasarkota.go.id